The Old Gotthard Tunnel Route - Driver's Eye View
The Old Gotthard Tunnel Route - Driver's Eye View

Storyline

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
    Released
    10/1/2018
    Runtime
    1h 52min
    Genre
    Status
    Released
    Language
    English
    Production
    Video 125
Cast
Logo
Nuxt Movies
Made with

Data provided by 

This project uses the TMDB API but is not endorsed or certified by TMDB.

Language: